Projects

Some Highway Projects executed by us:

NO. Project Client Status
HIGHWAYS
1 Emergency Repairs of the washout at Km 2 Isua along Ibillo (Edo State Border) – Ikare-Irun (Ekiti State Border) Route No. 553(F220) (2017) Federal Ministry of Power, Works and Housing, Abuja Completed
2 Construction   of   Ajase- Ipo/Offa/Erin-Ile/Osun State Boundary Road (Section 1 Ch0+000 – Ch8+000)(2014) Federal Ministry of Works, Abuja. Ongoing
3 Rehabilitation of Uba – Askira – Mbalala Road in Borno State (2010) Federal Ministry of Works, Abuja. Completed
4 Periodic Maintenance of Hung – Mubi Road in Adamawa State (2011) Road Sector Development Team (RSDT – World Bank Assisted), Federal Ministry of Works Abuja. Completed
5 Periodic Maintenance of Takai – Takai–Albasu–Gaya Road in Kano State (In Association with Heriprom Engineering Ltd.) (2011) Road Sector Development Team (RSDT – World Bank Assisted), Federal Ministry of Works Abuja. Completed
6 Maintenance Repairs by Retainership of Mokwa-Bida- Lapai-Lambata Road in Niger State (2007) Federal Roads Maintenance Agency,  Abuja Completed
7 Major Maintenance of Birnin Gwari – Kaduna Road in Kaduna State (2009) Federal Roads Maintenance Agency,  Abuja Completed
8 Emergency Repairs of Tegina Birnin-Gwari-Kaduna   State Border Road; Km 0+000 to Kaduna State Border, Tegina, Km.82+000 in Niger State (2012) Federal Ministry of Works, Abuja. Completed
9 Emergency Repairs of Aba- Azumini Road Km 17+000 to Km.21+600 in Abia State for the Operation Zero Pothole Programme. (2012) Federal Roads Maintenance Agency, Abuja Completed
10 Maintenance Repairs by Retainership of Bida-Wushishi-Zungeru Road in Niger State. (2006) Federal Roads Maintenance Agency, Abuja. Completed
11 Construction of Main Internal Road Network at Industrial Development Centre, Oshogbo for Oak Electric Nig. Ltd. (2006) Federal Ministry of Industries, Abuja. Completed
12 Construction of Drainages/Perimeter Survey Maps/Layout Plan for Estate/Topographical Map at Industrial Development Centre, Oshogbo for Elvino Nig. Ltd. (2006) Federal Ministry of Industries, Abuja. Completed
13 Construction of Secondary Internal Road Network at Industrial Development Centre, Oshogbo for Oak Electric Nig. Ltd. (2006) Federal Ministry of Industries, Abuja. Completed
Bridges and Hydraulic Structures
14 Rehabilitation of Bridge at km 37 across Ogun River along Maya-Iseyin Road, Oyo State. (2018) Federal Ministry of Power, Works and Housing, Abuja On-going
15 Construction of Ojutu bridge in Illobu – Osun State (2017) Federal Ministry of Power, Works and Housing, Abuja On-going
16 Construction of a Diversion Culvert at the Shiroro Dam Site. (2018) North South Power Co. Ltd Completed
17 Reinstatement of Collapse Transition Slab (Bida End) of Wuye  Bridge  Km.23+000 Along Bida-Mokwa Road Route No. 55 in Niger State (2012) Federal Roads Maintenance Agency, Abuja Completed
18 Emergency Repairs of Embankment Washout and Collapsed Apron at Km.2+150 RHS  (3mx3mx3m) Box Culvert on River Lazu (Bida Township) and Approach Road Along Bida – Lapai Road Route No. 55 in Niger State. (2012) Federal Roads Maintenance Agency, Abuja Completed
Fabrication Works/ Water Supply
19 Powerhouse Water Supply Project at Shiroro Power Station, Niger State. (2019) North South Power Co. Ltd. On-going
20 Fabrication of stop logs and supply of construction equipment and materials for the repair of unit 411G4 intake at Shiroro Hydroelectric power station(2015) North South Power Co. Ltd. Completed
21 Fabrication of stop logs and other steel structures and supply of Equipment for North South Power Ltd. (2015) North South Power Ltd. Completed
Erosion/Flood/Vegetation Control Projects
22 Vegetation Control of Kabba-Obajana-Section of Kabba-Lokoja Road in Kogi State and Share-Lafiagi-Patigi Road in Kwara State. (2007) Federal Roads Maintenance Agency, Abuja Completed
23 Iloro Ego-Igbanasa-Owo Flood Control Project in Owo Town, Owo LGA, Ondo State. (2013) Federal Ministry of Environment, Abuja. Completed
24 Adebayo Ighole Erosion Control Project, Ilorin, Kwara State (2012) Federal Ministry of Environment, Abuja. Completed
Installation of Street Lights
25 Installation of Streetlights on Badagry Expressway, Orile – Mile 2, Festac Roads in Lagos State. (2008) Federal Ministry of Transportation, Abuja. Completed
Building and Structures
26 Construction of Shopping Mall of 43 Offices on 4 Floors and 2,000m2 of Warehouse Space for Kazaash Nig. Ltd. at Kabusa District, Abuja. (2007) Kazaash Nig. Ltd. Phase 1 Completed
27 Comprehensive Development  of  Bankys Private School Involving 6 Multistorey Structures (2013) Bankys Private School, Abuja. Phase 1 Completed
28 Rehabilitation of Failed Sections and Repairs of Leakages on Skye Bank Plc., Jalingo Branch in Taraba State (2014) Skye Bank Plc Completed
29 Construction of Zonal Education Office at Gwagwalada, FCT. (2009) Federal Capital Territory Administration Completed
30 Construction of One (1) Unit of Two Bedroom Bungalow and One (1) Unit of Three Bedroom Bungalow in Bayelsa State (2010) Ministry of Niger Delta Affairs Completed
31 Construction of a Classroom Block in Osun State for Quickwins MDGs Projects (2009) State House,  Abuja Completed
32 Construction of Classroom Blocks in Osun State for Quickwins MDGs Projects (2008) State House,  Abuja Completed
33 Construction of a Computer Centre in Lagos State for Quickwins MDGs Projects (2009) State House,  Abuja Completed
34 Construction of Several Residential Buildings. (2004 – 2010) Several Individuals Completed
35 Construction of Church Auditorium & Pastorate for Glory Covenant Christian Centre, Ibadan. (2006) Glory Covenant Christian Centre, Ibadan Completed